75. During the construction, improvement, repair or maintenance of a road, the runoff from the roadway surface, other than a felling or hauling trail, other than a trail not intended for motorized all-terrain vehicles or other than a winter road, must be discharged outside the roadway and shoulders towards vegetation areas located more than 20 m from an open peat bog with a pond, a marsh, a riparian swamp, a lake or a watercourse.
473-2017O.C. 473-2017, s. 75.